WebAssembly Ideal for back room receiving, stock replenishment, and handling fashion separates. 6’ uprights, with one 5’ and one 30” hangrail, 500 lbs. capacity SIZE: 63” L X 23” … WebNov 8, 2024 · Slide the piece of equipment into place and line up the screw holes in its 4 front corners with the 4 cage nuts. This is easier with a helper. Insert the included screws through the screw holes and into the cage nuts, then hand-tighten them by twisting clockwise. Finish tightening the screws with a screwdriver. 7.
Heavy Duty Garment Z-Rack with 5 Shelves – Quality Fabricators
WebZ-Rack - Industrial Rack with Bolted Square Tubing Base More Info As low as $89.95 4-Way Garment Rack with Straight Arms - Rectangular Tubing Uprights More Info As low as … WebThis Z-Rack includes one bottom shelf and four top shelves. ... Silver (360900S) Yellow (360900Y / 819474011692) Red (360900R / 819474011708) Orange (360900O / 819474011685) Blue (360900BLU / 819474011678) Black (360900BLK / 819474011661) ... Steering Handles. Clear cover for Garment Rack (5’L x 6’H) Download the Heavy Duty … billy lynn\u0027s long halftime walk dvd
Assembly Instructions – Quality Fabricators
WebProduct Installation Instructions. Model N2W902490W5R - Assembly Manual. Model N2W902490W5B - Assembly Manual. Model N2W772478W4R - Assembly Manual. Model N2W772478W4B - Assembly Manual. Model N2W652454W3R - Assembly Manual. Model N2W652454W3B - Assembly Manual. Model N2R482478W5R - Assembly Manual. Model … Web- Assemble the orange Z FIRST ~ BEFORE THE WHEELS. If you put the wheels on first you can't unscrew the bolts that hold the orange Z together.-When putting the wheels together … WebASSEMBLY OF TIRE RACK - STARTER Two people are recommended for assembly. Approximate assembly time: 15-25 minutes. 2. Laying flat on the ground, connect two EUR upright (Ref. No. 1) posts together with two front-to-back supports (Ref. No. 2), one at the top and one near the bottom, leaving the bottom keyhole slot empty. Be sure the cynefin ks2